PROJECTS

 
 

 

 


 Sales Information:
 
Sales@globaltech-inc.com  

 Technical Support:

 Support@globaltech-inc.com

 

  Representative ProjectsPage 3/3
 
 

Nippon Steel Corporation, Singapore
Kuroshio I, Kuroshio II

 

On going engineering consulting services to minimize spare parts inventory cost and expedite delivery of critical components. In addition, GLOBALTECH provides purchasing support to locate hard to find hydraulic pumps, motors and various spare parts.

 

 
     
 
 

Cal Dive International, Intrepid
Designed, procured, assembled, programmed, installed, started and commissioned an upgraded Reel Pipe Lay Control System. In addition, provided complete technical documentation and training.

 

 
     
 
Global Industries, Ltd., Chickasaw
Upgraded Abandon & recovery Winch (ARW)
control system to operate in maximum water
depth of 1500 ft and handle maximum pipe
diameter of 48 inches. Also, provided complete
technical documentation, training and startup.
   
 
  Petrobras, Brazil, BGL 1
Provided engineering consulting, software consulting and field service for WESTTECH's 200 Kip Pipe tensioners Control System. The system featured AB PLC processor with manual backup and an automatic Abandon & Recovery Winch (ARW) transfer package.

 

     
 
GlobalSantaFe Co. Glomar Explorer

Provided engineering consulting, software consulting and field service for WESTTECH's Horizontal Pipe Racker Control System on board the Glomar Explorer. The control system was required to operate in a Class I Div I and Div II environment.

 

     
 

Page:  1  2 3
 




 

© 2006, Globaltech, all rights reserved.
info@globaltech-inc.com